TOWN OF ESTES PARK UTILITIES AND
PUBLIC WORKS PROJECTS
|
Completed Projects
|
|
|

|
 |
|
Virginia Drive Parking Lot
Completed October, 2008 |
Picnic
Tables at Tregent Park
Completed
May, 2008 |
 |
 |
|
Fall
River Trail, Phase 4 Completed
October, 2008 |
Sand & Salt Storage Tent
Completed February, 2008 |
CURRENT
PROJECTS
|
BOND PARK MASTER PLAN
& MULTI-PURPOSE EVENTS CENTER AND INDOOR ARENA
DIRECT ALL QUESTIONS AND
COMMENTS TO:
Scott Zurn, PE Public Works Director Town of Estes Park
PO Box 1200
170 MacGregor Avenue
Estes Park, CO 80517 970-577-3588
Bidding for the Bond Park Master plan closed
on April 3, 2009 & bidding for the Multi-Purpose Events
Center and Indoor Arena closed on May 29, 2009. |
DOWNTOWN CIRCULATION STUDY
DIRECT ALL QUESTIONS AND
COMMENTS TO:
Scott Zurn, PE Public Works Director Town of Estes Park PO Box 1200
170 MacGregor Avenue
Estes Park, CO 80517 970-577-3588
PBS&J, a transportation engineering firm, has
completed a circulation study identifying what improvements
could be made to improve traffic congestion in
downtown Estes Park.
Future capital improvements in this area will
be based in part on this study. |
NET-METERING FOR RENEWABLE ENERGY
DIRECT ALL QUESTIONS AND
COMMENTS TO:
Reuben Bergsten
Utilities Director Town of Estes Park PO Box 1200 170 MacGregor Ave. Estes Park, CO 80517
970-577-3583
Credit at 1kW to 1kW will be issued for
excess energy generated at a customer's site through the use
of an approved Customer Generator System (CG System),
through the town's new Agreement for Interconnection and
Parallel Operation of Small CG System.
This agreement will allow customers who -
through solar, wind or other approved renewable energy
system - create more energy than they need to feed that
excess back through the grid and be credited for it. |
PROJECTS OUT FOR BID
|
Tree Trimming on High Voltage Lines
2010 & 2011: The Town of Estes Park is
accepting bids for a one (1) – two (2) year contract for the
trimming of trees and foliage from and around high voltage
(7200/12470 volt) power lines on both single phase and three
phase primary lines between Estes Park, Allenspark, Glen
Haven and other areas as assigned. Contractors must be
certified to work in and around high voltage lines and have
specific equipment as outlined in the bid documents.
A full bid packet is available by clicking
here,
or at the offices of the project manager, Todd Steichen:
615 Elm Road in Estes Park. 970-577-3601. A
mandatory pre-bid walk-through will be held at the address
above on Friday, February 12, 2010. Bids must
be received at the address listed above or mailed to: PO Box
1200, Estes Park, CO 80517 Attn: Todd Steichen no
later than 3:30 p.m. on Wednesday, February 24, 2010.
Prospect Avenue Reconstruction
Major work items include the
removal and replacement of 2400’ of two-lane paved road,
5 stormwater catch basins, and 1000’ of new sidewalk
plus curb & gutter. Photos of the project area be
viewed by clicking
here.
Plans, specifications, and bid
documents may be procured from the Estes Park office of
Cornerstone Engineering & Surveying, Inc., 1692 Big
Thompson Ave., Suite 200, Estes Park CO 80517 Phone:
(970) 586-2458. Project documents may be obtained on or
after 8 a.m. Monday, February 1, 2010, upon payment of
$70.00 for plans and specifications (non-refundable).
Project documents may be mailed via U.S. Postal Service
for an additional charge of $20.00. There will be a
mandatory pre-bid conference on Tuesday, February 9,
2010, held at the Town of Estes Park Municipal
Building, Room 130, from 10 AM to 12 PM. Sealed bids
will be accepted on or before 2:00 P.M. (MDT) Thursday,
February 18, 2010.
|
FUTURE PROJECTS
|
|