TOWN OF ESTES PARK UTILITIES AND

PUBLIC WORKS PROJECTS

Ongoing Projects
Projects Out For Bid
Future Projects
 

Fall River Hydroplant Restroom,
completed Spring 2007

Post Office Parking Lot Reconstruction,
completed June 2007

ONGOING PROJECTS

UTILITY POLE INSPECTION AND TREATMENT

DIRECT ALL QUESTIONS AND COMMENTS TO:
Todd Steichen,
Line Superintendent
Town of Estes Park
P.O. Box 1200
170 MacGregor Avenue
Estes Park, CO 80517
970–577-3601

 

Establishing system wide pole integrity and treatment processes. 

The present service area is approximately 280 square miles and includes approximately 14,000 poles ranging in size from 25 to 60 feet. The terrain is rugged, wooded, and mountainous. System voltage is 7200/12,470.

SCOPE OF SERVICES

  1. Pole testing and subsequent treatment if necessary.
  1. Develop an electronic database that is ACCESS compatible.
  1. Electronic database that includes all pole information such as class, type, size, etc. along with joint use and code violation information.
  1. An electronic prioritized list for all needed repairs & replacements.
  1.  Develop a numbering scheme with heavy duty stainless or brass numbering tags.
  1. Map pole locations and put in ESRI shape file format coordinate system (NAD 1983 State Plane HARN).

 

PROJECTS OUT FOR BID

  There are no Utilities or Public Works projects out for bid at this time

 

FUTURE PROJECTS

MARYS LAKE ROAD BRIDGE REPLACEMENT

DIRECT ALL QUESTIONS AND COMMENTS TO:
1. Tom Melton, PBS & J
    Consultants: 303-221-7275
2. Ron Winnie, LCPW:
    498-5213

Construction has been postponed

Project design will continue in 20078.  Underground utility relocation is an issue with this project.